Labor Utilization for Tree Care: Why a 4-Hour Job Takes 10

Tree Care


Updated November 6th, 2026
Labor Utilization for Tree Care: Why a 4-Hour Job Takes 10

Labor utilization is the share of your paid crew hours spent on productive work at the job site. In tree care, drive time, shop time, setups, and breakdowns take the rest. Aim for about 70%, which gives you roughly 5.6 productive hours in an eight-hour day, then build that number into your estimates and your hourly rate.

You walk the property, size up the trees, and bid four hours. The crew wraps up at the end of the day, the truck rolls back to the yard, and the job gets marked done. Nobody asks whether it took four hours or ten.

That silence costs you. You sell labor hours, so every hour that isn’t spent cutting, rigging, or grinding is an hour you paid for and never billed. Most owners know their revenue to the dollar. Far fewer know their labor utilization rate.

Table of Contents

What Is Labor Utilization in Tree Care?

It’s productive hours divided by paid hours. Put a crew on the clock for eight hours, and if five and a half go to actual tree work, utilization is about 69%. The rest goes to loading the truck, driving, fueling, waiting out weather, fixing equipment, and unloading back at the yard.

Tim Walters, partner and head of operations at Miller’s Tree Service in Tallahassee, Florida, runs 8 to 9 crews and about 60 people. He keeps the target simple:

“I want to have 70% labor utilization, so that gives me 30% split between drive time and shop time.”

Tim Walters, Head of Operations, Miller’s Tree Service

What Is the Labor Utilization Formula?

Here’s the math for a standard day:

  • Eight hours is 480 minutes.
  • Multiply by 70% and you get 336 minutes.
  • Divide by 60 and you get 5.6 productive hours.

Jordan Upcavage, vice president of Independent Tree Service in Tampa, Florida, had estimated with 5.5 working hours per day for years, purely on gut feel. Walters’s 70% target backed him up with real math. And if you bid a full crew day as eight hours of work, you’re already about 2.5 hours behind before the first tree comes down.

The number lives inside your pricing, too. Walters builds shop time, drive time, maintenance, and office overhead into his rate of $140 to $145 per man-hour, and that rate assumes he hits 70%. Miss the target and the rate stops covering what it’s supposed to.

Who Controls the 30%?

Walters splits it down the middle. His half is scheduling: he builds the routes and decides how far crews drive. The other half belongs to crew leaders, who control how fast a loaded truck leaves the yard.

A crew that arrives at 7:00 and pulls out at 7:30 is doing well. One that doesn’t leave until 7:55 has some cleanup to do. Neither number is a criticism. It’s a target both sides can work on.

Routing made the biggest difference at Miller’s. Before Walters learned his route planner, utilization sat in the 50s and 60s on many days. Now he plans routes for crews, loader trucks, and stump grinders together, and he’s strict about distance: a job more than 15 minutes away gets a hard look. Shorter drives also mean less fuel and less time on the road, which helps your insurance exposure too.

In a recent poll of green industry operators, 86% named drive and shop time as their biggest profit leak. Only about 14% said they know to the dollar what each job costs.

Why Does a 4-Hour Tree Job Turn Into 10?

The estimate counted cutting time and left out everything around it.

One Miller’s job shows how it happens. The team sold a 15-tree removal for $5,500 and bid about four hours. The crew spent closer to ten. The estimate happened on a quiet Thursday afternoon, but the street turned out to be a busy through road, so the crew kept shutting down the setup to let traffic pass. Then a Florida rain delay hit right as the work picked up.

You can’t control the weather. You can control setups, and this job needed seven or eight of them.

“If you’d added an extra half hour for each one of those setups, that would have given us the 4 extra hours that we needed to come out.”

Tim Walters, Head of Operations, Miller’s Tree Service

Breakdowns hurt the same way:

“When you have a mechanical breakdown out on a job site, you’re paying the crew to not do anything at that point, so those are really hard.”

Tim Walters, Head of Operations, Miller’s Tree Service

Neither one is a surprise once you’ve lived through it. Both are predictable drags on utilization that never made it onto the bid. After that job, Walters sat down with the salesperson who sold it. His plan for next season is to price in setup time, traffic control, and “what could go wrong” up front.

How Do You Track Labor Utilization?

Track labor utilization by comparing the hours you pay your crews with the hours they spend on productive work at the job site. You need two numbers for each crew, and a way to capture them without chasing people down at the end of the day.

Decide up front what counts. Productive time is time spent cutting, rigging, chipping, grinding, and cleaning up on site. Everything else is non-productive: drive time, loading and unloading, fueling, shop time, breakdowns, and weather delays. Write the definition down so every crew leader measures the same way.

Then work the numbers:

  1. Record paid hours. Use clock-in to clock-out for each crew member.
  2. Record productive hours. Capture the time on site doing billable work. You can’t improve a rate you can’t see, and the method matters. Walters used to call crews at the end of each day and write down how long each job took. Now crews clock in and out of every job in his operating software, so the data’s there without the phone calls.
  3. Divide productive hours by paid hours. That’s the utilization rate for the crew.
  4. Look at it by crew and by week. One breakdown or rain delay can skew a single day, so judge crews on the weekly trend.
  5. Compare it to your target and your bids. Check the rate against your utilization target (70% in this article), and compare bid hours to actual hours on each job to see where the gap came from.

The review is where it pays off. Walters feeds the data into a profitability report and looks at results by crew and by salesperson, and every Monday the office posts a leaderboard. A little friendly competition does the rest. Even a 15-minute look each week is enough to catch problems while the season is still live.

When the number is low, it usually comes down to one of three things: long drives, slow yard departures, or setups and breakdowns that never made it onto the bid. Each has a different owner and a different fix, which is why it helps to see the data by crew and by job instead of one company-wide average.

What Can You Do This Week?

Start small. One job and one number will teach you more than a spreadsheet full of guesses.

  • Pull one recent job and compare bid hours to actual hours. Write down where the gap came from.
  • Set a utilization target. Seventy percent is a workable starting point. Decide who owns the drive-time half and who owns the shop-time half.
  • Add setup time to your estimates. Walters’s rule of thumb is an extra half hour per setup.
  • Check your hourly rate against the utilization you actually hit.
  • Time yard departures for a week. The gap between when crews arrive and when trucks roll shows you where shop time is going.
  • Pick one weekly review. Fifteen minutes on Monday looking at crew results beats a once-a-year surprise.

Want the Full Conversation?

This article draws on Numbers Don’t Lie, a SingleOps by Granum webinar with Tim Walters of Miller’s Tree Service, Jason Lee of Sky Frog Landscape, and Jordan Upcavage of Independent Tree Service. They get into more real jobs and the math behind each one. Watch the recording. When you’re ready to see your own job costs and crew hours in one place, we’d love to help.

Tree care worker wearing helmet smiling at the camera

Frequently Asked Questions

What is labor utilization in tree care?

Labor utilization is the share of your paid crew hours spent on productive work at the job site. It’s productive hours divided by paid hours. The rest goes to loading the truck, driving, fueling, waiting out weather, fixing equipment, and unloading back at the yard.

What is the labor utilization formula?

Divide productive hours by paid hours. For planning, multiply your paid hours by your target rate. Eight hours is 480 minutes, and 70% of that is 336 minutes, or 5.6 productive hours.

What is a good labor utilization rate for a tree care crew?

Tim Walters of Miller’s Tree Service targets 70%, which leaves 30% for drive time and shop time. That works out to about 5.6 productive hours in an eight-hour day. Before he learned his route planner, utilization at Miller’s sat in the 50s and 60s on many days.

Why does a 4-hour tree job turn into 10?

The estimate counted cutting time and left out everything around it. On one Miller’s job, the crew needed seven or eight setups, dealt with heavy traffic, and then lost time to a rain delay. Walters’s fix is to add an extra half hour per setup, and to price in traffic control and “what could go wrong” up front.

How do you track labor utilization?

Have crews clock in and out of every job in your operating software instead of calling them at the end of the day. Then review the data by crew and by salesperson. Walters looks at a profitability report and posts a crew leaderboard every Monday.